Success!

Successfully saved your search
Alberta Green Energy - Electricity Marketer Alberta Green Energy a division of Utility Network Alberta Green Energy a division of Utility Network & Partners Inc.
Algonquin Power Operating Trust Algonquin Power Dickson Dam 15 MW
AltaGas Ltd. AltaGas Ltd. 2010 CCD-003 COMMERCIAL
AltaGas Ltd. AltaGas Ltd. 2010 CCD-003 RESIDENTIAL
Ardenville Wind Farm TransAlta Corporation 2010 CCD-003, 69 MW
Barr Creek Hydroelectric Project Barr Creek Limited Partnership 16.02 GWh/year, 4.4 MW
Batawa Hydroelectric Project Trent-Severn Power Corporation The Batawa Facility draws water from the Trent-Severn Waterway, and comprises Balsam, Sturgeon, Buckhorn, Stony and Rice Lakes. This Facility consists of a run-of-the-river hydroelectric generating station with an installed capacity of 5 MW that holds one...view more The Batawa Facility draws water from the Trent-Severn Waterway, and comprises Balsam, Sturgeon, Buckhorn, Stony and Rice Lakes. This Facility consists of a run-of-the-river hydroelectric generating station with an installed capacity of 5 MW that holds one double-regulated Kaplan pit-type turbine. view less
Bear Mountain Wind Park Bear Mountain Wind Limited Partnership (LP) 102 MW
Belly River TransAlta Corporation II, 0.6 MW
Belly River Bend TransAlta Corporation II, 0.6 MW
Big Silver Creek Hydroelectric Project Big Silver Creek Power Limited Partnership Big Silver Creek is a run-of-river hydroelectric power generating facility with an installed capacity of 40.6 MW and an average annual production estimated to reach 139.8 GWh, enough to power more than 12,700 households. It is located approximately 40 km ...view more Big Silver Creek is a run-of-river hydroelectric power generating facility with an installed capacity of 40.6 MW and an average annual production estimated to reach 139.8 GWh, enough to power more than 12,700 households. It is located approximately 40 km north of Harrison Hot Springs, British Columbia. view less
Blue Ridge TransAlta Corporation II, 0.6 MW
Blue Ridge West TransAlta Corporation III, 0.66 MW
Blue Trail Wind Farm TransAlta Corporation 2010 CCD-003, 66 MW
Bow Valley Power Bow Valley Power Residential and Commercial pow
Bow Valley Power Bow Valley Power Residential and Commercial pow
Box Canyon Hydro Box Canyon Hydro 16 MW water powered
Canoe Creek Hydro Project Canoe Creek Hydro Company 5.5MW
Caribou Wind Park C2C Power GP Inc 99 MW
Castle River TransAlta Corporation II, 0.66 MW; III, 29.04 MW; II, 9.9 MW
Castle Rock Ridge Wind Project Castle Rock Ridge Limited Partnership 76.23 MW
Centrale Chute Garneau Ville de Saguenay (Hydro Jonquiere) 4.95 MW/h
Centrale Pond-Arnaud Ville de Saguenay (Hydro Jonquiere) 8.25 MW/h
Chute Thompson - rivière Franquelin Société d'énergie Rivière Franquelin Inc. 2010 CCD-003, 9.9 MW
Chutes-à-Gorry (Saint Anne) Société d'Énergie Columbus Inc. Chutes-à-Gorry (Saint Anne) – 9.9MW Waterpower facility
Courbe-du-Sault Societe d'Energie Riviere Sheldrake 25 MW hydropower facility
Cowley North - 19.5 MW TransAlta Corporation 19.5 MW
Cowley Ridge - 18.9MW TransAlta Corporation 18.9 MW
CP Energy Marketing LP Commercial CP Energy Marketing LP Commercial 2010 Electricity CCD-003, 13.0 MW
CP Energy Marketing LP Commercial Quality Wind Project 2010 Electricity CCD-003, 13.0 MW
CP Energy Marketing LP Commercial Taylor Chute Hydroelectric Plant 2010 Electricity CCD-003, 13.0 MW
East Point Wind Farm PEI Energy Corporation (The) 2010 CCD-003, 30 MW
East Twin Creek Hydroelectric Project Valemount Hydro Limited Partnership (Brookfield Energy Marketing Inc.) EA-VALE-003-500 East Twin Creek Hydroelectric Project
Electricity Swift Power Run of River Hydro
Ellerhouse Wind Farm Alternative Resource Energy Authority Wind Energy converters
Encor Chirp EPCOR Encor Chirp by EPCOR offers customers more choice of green energy at 3 levels of 15%, 50% and 100%. With Encor Chirp, customers are in control to pick and choose their plan, mix and match percentage levels, and even bundle all of their services on to one ...view more Encor Chirp by EPCOR offers customers more choice of green energy at 3 levels of 15%, 50% and 100%. With Encor Chirp, customers are in control to pick and choose their plan, mix and match percentage levels, and even bundle all of their services on to one convenient bill. view less
Forest Kerr Run-of-River Hydroelectric facility Coast Mountain Hydro LTP 2010 CCD-003 - 195MW
Grand Prairie 25.30MW International Paper Canada Pulp Holdings ULC 2010 CCD-003,, 25.300 MW
Grand Prairie 48.537MW International Paper Canada Pulp Holdings ULC 2010 CCD-003, 48.537 MW
Gros-Morne Wind Farm Gros-Morne Wind Farm 211.5 MW
Haa-ak-suuk Creek Hydro Haa-ak-suuk Creek Hydro Haa-ak-suuk Creek Hydro 6.0 MW
High Falls Generating Station Power Limited Partnership, The 2010 CCD-003, 5.8MW
Howe Sound Pulp & Paper 50.0 MW Howe Sound Pulp and Paper Corporation 50.0 MW
Howe Sound Pulp & Paper 62.5 MW Howe Sound Pulp and Paper Corporation 62.5 MW
Hydro Electricity Regional Power Inc. - Long Lake Hydro Project 2010 CCD-003 Renewable Low-Impact Electricity Products Standard
Intercontinential Pulp Canfor Pulp Limited Partnership 2010 CCD-003, 25 MW
Jean Guérin Société d'Énergie Columbus Inc. 5.87 MW waterpower facility
Jimmie Creek Power Plant Jimmie Creek Limited Partnership Renewably energy from Jimmie Creek Hydroelectric plant
Just Energy Commercial Just Energy .
Just Energy Residential Just Energy .
Kamloops Mill Domtar Inc. Environmental Attributes from green electricity production, also known as Renewable Energy Certificates or RECs are produced at the Domtar Inc. Kamloops Pulp Mill from the combustion of clean biomass (hog fuel and black liquor.) The RECs are sold separate...view more Environmental Attributes from green electricity production, also known as Renewable Energy Certificates or RECs are produced at the Domtar Inc. Kamloops Pulp Mill from the combustion of clean biomass (hog fuel and black liquor.) The RECs are sold separately from the electricity produced. view less
Kapuskasing Operations Tembec 2010 CCD-003, 9 MW
Kent Hills Expansion Wind Farm TransAlta Corporation Type III, 54 MW
Kent Hills Expansion Wind Farm TransAlta Corporation Type III, 54 MW
Kent Hills Wind Farm 150 MW TransAlta Corporation III, 96 MW
Kettles Hill Windfarm Enmax Corporation Kettles Hill Windfarm
Kokish River Brookfield Energy Marketing - Kokish 45 MW
Kwoiek Creek Hydroelectric Project Kwoiek Creek Resources Limited Partnership Kwoiek Creek is a 49.9 MW, run-of-river project located on the lower reaches of Kwoiek Creek, a tributary to the Fraser River, British Columbia. Construction of the access for the Project commenced in June 2011, and project construction was completed in ...view more Kwoiek Creek is a 49.9 MW, run-of-river project located on the lower reaches of Kwoiek Creek, a tributary to the Fraser River, British Columbia. Construction of the access for the Project commenced in June 2011, and project construction was completed in December 2013. view less
Lower Bear Hydro Project Bear Hydro Limited Partnership 10 MW
LP Golden Powerhouse Louisiana Pacific Canada Ltd. 2010 CCD-003, 7.5 MW
Madawaska Hydro Dam Modernization Edmundston Energy CCD-003, 3.8
McBride Lake East TransAlta Corporation III, 0.66 MW
McBride Lake I / II TransAlta Corporation III, 75.2 MW
Melancthon I Wind Plant TransAlta Corporation III, 67.5 MW
Melancthon II Wind Project TransAlta Corporation III, 132 MW
Miller Creek Hydroelectric Project Brown Miller Power Limited Partnership Miller Creek is a run-of-river hydroelectric facility of 33 MW located on Crown land near Pemberton, in the Lower Mainland region of the province, in close proximity to several other Innergex’s hydroelectric facilities.
New Richmond Wind - 66MW TransAlta Corporation New Richmond Wind - 66MW
North Cape Wind Farm, Phase I PEI Energy Corporation (The) 2010 CCD-003, 5.28 MW
North Cape Wind Farm, Phase II PEI Energy Corporation (The) 2010 CCD-003, 10.56MW
Northwest Stave Hydroelectric Project Northwest Stave River Hydro Limited Partnership Northwest Stave River is a 17.5 MW run-of-river hydroelectric facility located on Crown land, approximately 50 km north of Mission, British Columbia. Northwest Stave’s average annual production is estimated to reach 63,300 MWh, enough to power more tha...view more Northwest Stave River is a 17.5 MW run-of-river hydroelectric facility located on Crown land, approximately 50 km north of Mission, British Columbia. Northwest Stave’s average annual production is estimated to reach 63,300 MWh, enough to power more than 5,500 BC households. view less
Northwood Pulp , TG-B 30.0 MW Canfor Pulp Limited Partnership 2010 CCD-003, TG-B 30.0 MW
Northwood Pulp - TG-A 33.0 MW Canfor Pulp Limited Partnership 2010 CCD-003, TG-A 33.0 MW
Norway Wind Park C2C Power GP Inc 9 MW
Parc éolien le Nordais TransAlta Corporation II, 53 MW
Parc éolien le Nordais TransAlta Corporation II, 47 MW
Petites Bergeronnes Société d'Énergie Columbus Inc. 4.2 MW waterpower facility Ecologo CCD003-2010
Pickering Wind Generating Site Ontario Power Generation 1.8 MW
Prince George Pulp and Paper Canfor Pulp Limited Partnership 2010 CCD-003, 59.9 MW
Ptarmigan Creek Hydro Plant Robson Valley Power Corporation Commissioned 1992, 3.6 MW
Raging River Power & Mining Inc. Raging River Power & Mining Inc. Raging River Power & Mining Inc. Megawatts: 8 MW
Sinnot Wind Plant TransAlta Corporation III, 6.5 MW
Skookumchuck Operations Skookumchuck Pulp Inc. III, 43.5 MW
Soderglen Wind Project TransAlta Corporation III, 70.5 MW
St. Joseph Windfarm St. Joseph Windfarm Inc. 2010 CCD-003, 138 MW
St. Leon Wind Energy LP- 99 MW St. Leon Wind Energy LP 99 MW
St. Leon Wind Farm Phase 2 - 16.5 MW St. Leon Wind Energy LP 16.5 MW
Summerview Turbine V80 TransAlta Corporation Summerview Turbine V80
Summerview Wind Farm Phase II TransAlta Corporation 2010 CCD-003
Summerview Windfarm TransAlta Corporation III, 68.4 MW
Taber Wind Farm Enmax Corporation 81.4 MW
Taylor Chute Hydroelectric Facility - 13.7 MW TransAlta Corporation II, 13 MW
Thunder Bay Mill Resolute Forest Products 2010 CCD-003, 45 MW
TransCanada REC Marketing TransCanada G.M. Limited Partnership and 2010 CCD-003 Renewable Low-Impact Electricity Products.
Tretheway Creek Power Limited Partnership / Tretheway Creek Hydroelectric Project Tretheway Creek Power Limited Partnership Tretheway Creek is a run-of-river hydroelectric power generating facility with an installed capacity of 21.2 MW and an average annual production estimated to reach 81,000 MWh, enough to power more than 7,300 households. It is located approximately 50 km n...view more Tretheway Creek is a run-of-river hydroelectric power generating facility with an installed capacity of 21.2 MW and an average annual production estimated to reach 81,000 MWh, enough to power more than 7,300 households. It is located approximately 50 km north of Harrison Hot Springs, British Columbia. view less
Upper Bear Hydro Project Bear Hydro Limited Partnership 10 MW
Waterton Group-Hill Springs Wind Farm 0.66 MW TransAlta Corporation 0.66 MW
Waterton South Group-Hill Springs Wind Farm 0.66 MW TransAlta Corporation 0.66 MW
West Cape Wind Park C2C Power GP Inc 99 MW
Whitecourt Power Biomass Generating Station Whitecourt Power Limited Partnership 2010 CCD-003, 25 MW
Wolfe Island Wind Farm - 197.8 megawatts (MW) TransAlta Corporation III, 197.8 MW